Marulan Project Environmental Assessment

The Environmental Assessment for the Marulan Gas Turbine Facilities Project is structured in two volumes.

Volume One is the Joint Concept Application and Volume Two consists of the Project Application.

Click on the relevant link below to access that section of the Environmental Assessment.

Volume 1 Joint Concept Application

Chapter Title
Contents Contents, Glossary (size 0.26 MB)
Executive Summary Executive Summary (size 0.02 MB)
Chapter 1 Introduction (size 1.5 MB)
Chapter 2 Project Need and Justification (size 0.2 MB)
Chapter 3 Alternatives (size 0.57 MB)
Chapter 4 Project Description (size 3.2MB)
Chapter 5 Statutory Planning (size 0.07 MB)
Chapter 6 Consultation (size 0.09 MB)
Chapter 7 Air Quality (size 0.16 MB)
Chapter 8 Noise and Vibration (size 0.83 MB)
Chapter 9 Soils, Geology and Groundwater (size 0.11 MB)
Chapter 10 Traffic and Transport (size 2.7 MB)
Chapter 11 Flora and Fauna (size 1.4MB)
Chapter 12 Cultural Heritage (size 1.5 MB)
Chapter 13 Visual Amenity (size 2.7 MB)
Chapter 14 Water Cycle Management (size 1.5 MB)
Chapter 15 Preliminary Hazard Analysis (size 0.11 MB)
Chapter 16 Bush Fire Assessment (size 0.90 MB)
Chapter 17 Land Use (size 0.13 MB)
Chapter 18 Socio Economic (size 0.12 MB)
Chapter 19 Draft Statement of Commitments (size 0.15 MB)
Chapter 20 Conclusions (size 0.11 MB)
References References (size 0.02 MB)
Study Team Study Team (size 0.02 MB)
Appendix A Environmental Assessment Requirements (size 3.5 MB)
Appendix B Statutory Authority Correspondence (size 2.8 MB)
Appendix C Consultation Material (size 3.7 MB)
Appendix D Noise & Vibration Assessment – Site Preparation (size 1.0 MB)
Appendix E Traffic Assessment – Site Preparation (size 4.9 MB)
Appendix F Flora and Fauna Assessment (size 4.5 MB)
Appendix G Cultural Heritage Assessment (size 4.1 MB)
Appendix H Preliminary Hazard Analysis – Gas Pipeline (size 2.2 MB)

Volume 2 Project Application

Chapter Title
Contents Contents, Glossary (size 0.45 MB)
Executive Summary Executive Summary (size 0.07 MB)
Chapter 1 Introduction (size 1.5 MB)
Chapter 2 Project Need and Justification (size 0.18 MB)
Chapter 3 Alternatives (size 0.09 MB)
Chapter 4 Project Description (size 1MB)
Chapter 5 Statutory Planning (size 0.09 MB)
Chapter 6 Consultation (size 0.11 MB)
Chapter 7 Air Quality (size 0.19 MB)
Chapter 8 Noise and Vibration (size 0.83 MB)
Chapter 9 Soils, Geology and Groundwater (size 0.11 MB)
Chapter 10 Traffic and Transport (size 2.7 MB)
Chapter 11 Flora and Fauna (size 3.3MB)
Chapter 12 Heritage (size 0.48 MB)
Chapter 13 Visual Amenity (size 3.8 MB)
Chapter 14 Water Cycle Management (size 1.2 MB)
Chapter 15 Preliminary Hazard Analysis (size 0.11 MB)
Chapter 16 Bush Fire Assessment (size 0.93 MB)
Chapter 17 Land Use (size 0.09 MB)
Chapter 18 Socio Economic (size 0.10 MB)
Chapter 19 Draft Statement of Commitments (size 0.11 MB)
Chapter 20 Conclusions (size 0.08 MB)
References References (size 0.05 MB)
Study Team Study Team (size 0.06 MB)
Appendix A Environmental Assessment Requirements (size 3.1 MB)
Appendix B Statutory Authority Correspondence (size 2.6 MB)
Appendix C Consultation Material (size 4.0 MB)
Appendix D Part 1 Air Quality Assessment Part 1(size 2.6 MB)
Appendix D Part 2 Air Quality Assessment Part 1(size 2.6 MB)
Appendix E Noise & Vibration Assessment – Site Preparation (size 1.6 MB)
Appendix F Part 1 Traffic Assessment – Part 1 (size 2.3 MB)
Appendix F Part 2 Traffic Assessment – Part 2 (size 4.7 MB)
Appendix G Part 1 Visual Assessment Part 1 (size 4.8 MB)
Appendix G Part 2 Visual Assessment Part 2 (size 4.8 MB)
Appendix G Part 3 Visual Assessment Part 3 (size 5.0 MB)
Appendix H Preliminary Hazard Analysis – Gas Pipeline (size 2.2 MB)
Appendix I Bush Fire Assessment (size 1.6 MB)